Pages

Thursday 22 February 2018

#Ulterra’s new design, CF613, drilled the curve in Blaine County in 47.5 hrs with an ROP of 23.7 which thoroughly beat their last two curves.

’s new design, CF613, drilled the curve in Blaine County in 47.5 hrs with an ROP of 23.7 which thoroughly beat their last two curves.



source https://twitter.com/UlterraBits/status/966776641463648256

No comments:

Post a Comment