Pages

Thursday 15 February 2018

Drilling with Statoil & Nabors, #Ulterra's 8.75" CF516 drilled the 692 ft curve in 6.7 hrs with an ROP of 104.8 ft/hr in Williams Co.

Drilling with Statoil & Nabors, 's 8.75" CF516 drilled the 692 ft curve in 6.7 hrs with an ROP of 104.8 ft/hr in Williams Co.



source https://twitter.com/UlterraBits/status/964235115164569602

No comments:

Post a Comment