Pages

Tuesday 6 February 2018

Drilling with PDC Energy, the Rockies have had two consecutive monobore runs with the 8.5" SPL516. The first run drilled 13,614 ft with an ROP of 231.5 ft/hr and the second drilled 13,508 ft with an ROP of 248.3 ft/hr in Weld Co. #Ulterra

Drilling with PDC Energy, the Rockies have had two consecutive monobore runs with the 8.5" SPL516. The first run drilled 13,614 ft with an ROP of 231.5 ft/hr and the second drilled 13,508 ft with an ROP of 248.3 ft/hr in Weld Co.



source https://twitter.com/UlterraBits/status/960942675728924672

No comments:

Post a Comment