Pages

Friday 8 December 2017

#Ulterra's 12.25" CF716 completed back to back intermediates in West Texas with one bit drilling with XTO. The first well drilled 7,766 ft with an ROP of 89 ft/hr and the second drilled 7,627 ft with an ROP of 116 ft/hr.

's 12.25" CF716 completed back to back intermediates in West Texas with one bit drilling with XTO. The first well drilled 7,766 ft with an ROP of 89 ft/hr and the second drilled 7,627 ft with an ROP of 116 ft/hr.



source https://twitter.com/UlterraBits/status/939210977186385922

No comments:

Post a Comment